Monday, 28 September 2009

Blog Checklist

  • Storyboard - Done
  • Shot List
  • Timeline
  • Location Scouting
  • Props List - Done
  • Costume Details
  • Confirmation of Actors - Done
  • Call sheet

No response to “Blog Checklist”

Leave a reply

 
© 2009 GROUP 12 - Music Video 2009/10. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz